Skip to main content
YCWA Logo

YUBA COUNTY WATER AGENCY Relicensing Website

Go Search
YCWA Relicensing Website
  
YUBA COUNTY WATER AGENCY Relicensing Website > Events Calendar > Relicensing Participants Meeting: (CANCELLED) Water Balance/Operations Model Study - Model Report, Valication and Base Case. Description of Model, Modeling Options and Post-Processing.  

Events Calendar: Relicensing Participants Meeting: (CANCELLED) Water Balance/Operations Model Study - Model Report, Valication and Base Case. Description of Model, Modeling Options and Post-Processing.

Export Event

Title

Relicensing Participants Meeting:  (CANCELLED) Water Balance/Operations Model Study - Model Report, Valication and Base Case.  Description of Model, Modeling Options and Post-Processing. 

Location

HDR, Natomas 

Start Time

5/23/2012 9:00 AM 

End Time

5/23/2012 4:00 PM 

Description

The FERC-approved Study 2.2, Water Balance/Operations Model, states:  "YCWA intends to collaborate with Relicensing Participants on certain aspects of model developmetn and to consult/advise Relicensing Participants of the more basic elements of the model.  Much of the work to prepare a basic model platform has been completed, and YCWA intends to provide interested Relicening Participants with detailed information about these effors, model basics, and justification for model representation of physical and operational aspects of the Project.  These early efforts are intended to complete the foundational platform for the model to accurately represent the current physical configuration of the Project, Yuba River hydrology, and existing operational conditions.  Concurrent with this work, YCWA intends to collaborate with Relicensing Participants on the more variable, discretionary elements of project operations, model output and additional post-processing needs for refined analysis and information."
 
To this end, YCWA will discuss the model report, validation report, and base case, and the model itself will be presented in the afternoon, along with a discussion of some of the various modeling options and post-processing needs.

All Day Event

 

Recurrence

 

Workspace

Attachments
Created at 4/24/2012 4:51 PM  by ESW\sheila.pitts 
Last modified at 4/27/2012 11:04 AM  by ESW\jim.lynch